Quick Step Laminate
Please contact one of our friendly sales advisor's for prices
Specification | |
---|---|
Range: | Quick-Step Impressive Ultra |
Type: | Uniclic |
Pack size: | 1.311m² - 5 planks |
Board size: | 1380mm x 190mm x 12mm |
Pattern length: | 1380mm |
Finish: | Silk Matt |
Sandblasted Oak Natural IMU1853
Sandblasted Oak Natural IMU1853 Suitability
Suitable for all rooms especially, bathrooms, kitchens, laundry rooms and entrance halls.
Sandblasted Oak Natural IMU1853 Suitability Description
Laminate Flooring.
Quick-Step Impressive Ulta is a collection of laminate floors that looks and feels exceptionally natural. The planks' authentic wood grains, for example, are perfectly reflected into the floor's joints as well. And there's more: thanks to a unique water-repellent 'HydroSeal' coating, Impressive Ultra laminate is not only beautiful, it's also the most waterproof laminate flooring ever produced.
Matching accessories are available for this floor
Warranty Quick Step IMPRESSIVE ULTRA:
25 year
Free delivery for orders over £175 within 10 miles of our shop. Please contact us on 01268 530554 for a quote for those outside the 10 mile radius. Products can also be collected from our shop in Basildon.
Installation Instructions for Quick-Step Impressive & Impressive Ultra en
For best results, it is essential that you follow the installation instructions exactly.
Preparation
Let the planks acclimatise for 48 hours in the unopened packaging, at the normal room temperature, in the middle of the room where the floor is to be installed.
The ideal conditions are 15-20°C (59-68°F) at a relative humidity of 50-60%.
Fresh Screed
Fresh screed, up to 4cm thick, must dry for at least 1 week per cm thickness when sufficient ventilation is available.
Fresh screed over 4cm will require 2 weeks per cm thickness when sufficient ventilation is available.
For example, a 6cm screed must dry for at least 8 weeks. For thicknesses over 6cm you must add 3 to 4 weeks per cm. The moisture content must be less than 2.5% for cement bound screed (CM method) and 0.5% for an anhydrite bound screed.
Remove any damp open flooring covering (carpets, needle felt, etc) first. Damp proof floor covering (PVC, linoleum, etc) does not have to be removed except if it is to compressible.
Always use an underlay. Quick-Step recommends the use of Quick-Step underlay.
Wooden Subfloor
Remove any existing flooring covering first. Check there are no signs of mould or insect infestations and that the subfloor is level. Nail down any loose parts.
If your plank floor is on the ground level of your building, lay a plastic foil first (Quick-Step screen). Then apply a levelling floor (Quick-Step soft board) on top of this. For a perfect subfloor preparation, it is recommended to lay a Quick-Step underlay on top of the soft board to level any unevenness between the soft board planks.
Install the new floor at ninety degrees to the existing subfloor. The crawl space under the plank floor must be sufficiently ventilated. Remove any obstacles and make sure there is sufficient ventilation; minimum 4cm squared total ventilation openings per metre squared of floor.
The moisture content of the wood must not exceed 10%.
If laying under floor heating, additional instructions are needed. Please see the www.quick-step.com website for details.
Make sure the floor base is flat, clean, firm, dry and that there are no indications that this condition will change in the future. Any unevenness greater than 2mm over the length of 1 meter must be smoothed out.
Check whether the old skirting board can be removed. You can also leave the skirting on the wall and finish the floor with Quick-Step profiles.
Check that the doors can still open and close after the floor and underlay have been installed.
For best results, it is essential that you follow the installation instructions exactly.
Preparation
Let the planks acclimatise for 48 hours in the unopened packaging, at the normal room temperature, in the middle of the room where the floor is to be installed.
The ideal conditions are 15-20°C (59-68°F) at a relative humidity of 50-60%.
Fresh Screed
Fresh screed, up to 4cm thick, must dry for at least 1 week per cm thickness when sufficient ventilation is available.
Fresh screed over 4cm will require 2 weeks per cm thickness when sufficient ventilation is available.
For example, a 6cm screed must dry for at least 8 weeks. For thicknesses over 6cm you must add 3 to 4 weeks per cm. The moisture content must be less than 2.5% for cement bound screed (CM method) and 0.5% for an anhydrite bound screed.
Remove any damp open flooring covering (carpets, needle felt, etc) first. Damp proof floor covering (PVC, linoleum, etc) does not have to be removed except if it is to compressible.
Always use an underlay. Quick-Step recommends the use of Quick-Step underlay.
Wooden Subfloor
Remove any existing flooring covering first. Check there are no signs of mould or insect infestations and that the subfloor is level. Nail down any loose parts.
If your plank floor is on the ground level of your building, lay a plastic foil first (Quick-Step screen). Then apply a levelling floor (Quick-Step soft board) on top of this. For a perfect subfloor preparation, it is recommended to lay a Quick-Step underlay on top of the soft board to level any unevenness between the soft board planks.
Install the new floor at ninety degrees to the existing subfloor. The crawl space under the plank floor must be sufficiently ventilated. Remove any obstacles and make sure there is sufficient ventilation; minimum 4cm squared total ventilation openings per metre squared of floor.
The moisture content of the wood must not exceed 10%.
If laying under floor heating, additional instructions are needed. Please see the www.quick-step.com website for details.
Make sure the floor base is flat, clean, firm, dry and that there are no indications that this condition will change in the future. Any unevenness greater than 2mm over the length of 1 meter must be smoothed out.
Check whether the old skirting board can be removed. You can also leave the skirting on the wall and finish the floor with Quick-Step profiles.
Check that the doors can still open and close after the floor and underlay have been installed.
Quick-Step Floor Care
Quick-Step floors are not only beautiful they are also easy to clean.
You can clean your floor dry with the dedicated Quick-Step microfiber mop. For a more thorough cleaning, you can also use the mop slightly moistened.
Quick-Step Cleaning Kit (QSCLEANINGKIT)
Practical and easy to use, the Quick-Step cleaning kit consists of a mop holder with adjustable handle, a washable microfiber mop and a bottle of Quick-Step cleaning product. You can use the mop dry or slightly moist.
Quick-Step Repair Kit (QSREPAIR)
Light damage can easily be repaired in the original colour with the Quick-Step repair kit. Simply recreate the colour of your damaged planks with one of the seven wax pieces selected to cover all Quick-Step colours.
The repair kit contains a melting knife, a cleaning comb and seven wax blocks to cover all floor colours.
Quick-Step floors are not only beautiful they are also easy to clean.
You can clean your floor dry with the dedicated Quick-Step microfiber mop. For a more thorough cleaning, you can also use the mop slightly moistened.
Quick-Step Cleaning Kit (QSCLEANINGKIT)
Practical and easy to use, the Quick-Step cleaning kit consists of a mop holder with adjustable handle, a washable microfiber mop and a bottle of Quick-Step cleaning product. You can use the mop dry or slightly moist.
Quick-Step Repair Kit (QSREPAIR)
Light damage can easily be repaired in the original colour with the Quick-Step repair kit. Simply recreate the colour of your damaged planks with one of the seven wax pieces selected to cover all Quick-Step colours.
The repair kit contains a melting knife, a cleaning comb and seven wax blocks to cover all floor colours.